4x4 Bridge in Perth-shire
Friday, 03 June 2011 09:33
Bridges


We have just completed a veichle bridge in Perth-shire. The 14m structure was installed to allow heavier machinery to access the hill road. Reinforced concrete foundations were used to hold the steel H beam structure, larch timber was used for the decking and hand rails. The same method of bridge construction was used for another bridge in the Highlands but the concrete for this bridge was flown in by helicopter. MOA are fully insured with a range of Health and Saftey certificates, employees are trained and qualified to deliver a wide range of engineered bridge designs all over Scotland.